Construction of the tramway to Freiburg-Haslach, Germany

Ongoing projects in Germany (Selection)

Project Titel
linie Country
linie Brief Description of Project
linie
Safety assessment for the storage dam Köhlgarten­wiese
linie Germany, Baden- Württemberg
linie Safety report and detailed safety assessment in accordance with DIN 19700 for the storage dam of the hydroelectric power plant Köhlgarten­wiese, assessment of dam break scenario. (205)
linie
Rehabilitation of a retention space weir near Breisach and a weir near Möhlin
linie Germany, Baden- Württemberg
linie Rehabilitation of the solid structures of the retention space weir near Breisach and the weir near Möhlin within the scope of the creation of a retention space near Breisach. (204)
linie
Flood control reservoir on the estuary of the river Elz
linie Germany, Baden- Württemberg
linie Rehabilitation of the main dam of the river Rhine on a length of 4.5 km within the scope of the construction of a flood control reservoir on the estuary of the river Elz. (203)
linie
Construction of a hydro­electric power plant on the river Wiese near Hausen
linie Germany, Baden- Württemberg
linie Design of a hydroelectric power plant on the river Wiese and restoration of mitigation possibilities for fish and other aquatic organisms. (202)
linie
Flood control plan Wethau
linie Germany, Saxony- Anhalt
linie Study with a focus on two-dimen­sional flow modelling, identification of flood-prone areas, damage potential analysis and planning of measures over a river length of 26 km. (194)
linie
Construction of a potable water conduit in Mainz
linie Germany, Rhineland- Palatinate
linie Study for the construction of a potable water conduit (DN 500) in Mainz with a total length of 900 m. (180)
linie
Rehabilitation of several dams on the river Elz
linie Germany, Baden- Württemberg
linie Rehabilitation of several dams on the river Elz in the direct vicinity of the cities of Emmendingen and Tenningen. (173)
linie
Construction of a hydro­electric power plant in Achdorf on the river Wutach
linie Germany, Baden- Württemberg
linie Design of a hydroelectric power plant on the river Wutach and restoration of mitigation possibilities for fish and other aquatic organisms. (171)
linie
Safety assessment and rehabilitation design for the flood retention basin St. Georgen / Schallstadt
linie Germany, Baden- Württemberg
linie Safety report and intensive surveil­lance of the flood retention basin St. Georgen / Schallstadt in accordance with DIN 19700. Rehabilitation design, assessment of dam break scenario. (165)
linie
Hydraulic calculations and sediment transport analysis for the river Dreisam in Freiburg
linie Germany, Baden- Württemberg
linie 1-D and 2-D hydraulic calculations of the river Dreisam with and without sediment transport in order to define the impact of sedimentation on water levels. (163)
linie
Rehabilitation of a weir on the river Elz near the city of Kollmarsreute
linie Germany, Baden- Württemberg
linie Inventory, analysis of historical damage patterns, hydraulic investi­gations and rehabilitation scheme for the weir in Kollmarsreute. (162)
linie
Flood risk analysis for the natural gas processing plant Rysumer Nacken.
linie Germany, Lower Saxony
linie Flood risk analysis for a natural gas processing plant near the estuary of the river Ems. Development and description of possible immediate and long-term measures aiming at flood protection. (160)
linie
Construction of a hydro­power plant near Rhein­felden - construction supervision
linie Germany, Baden- Württemberg
linie Construction supervision for the construction of a hydropower plant near Rheinfelden. (158)
linie
Action plans for noise abatement in the city of Lahr
linie Germany, Baden- Württemberg
linie Strategic noise mapping including annoyance analysis. (154)
linie
Study on the water supply of Schwerin
linie Germany, Mecklenburg- Western Pomerania
linie Determination of required storage capacities for the potable water supply in the service area of the water company WAG Schwerin including building-site progress analysis (116)
linie
Optimisation of long- distance water supply in East Thuringia
linie Germany, Thuringia
linie Design of 300 m of raw water lines DN 1200 including anchoring of the lines on a steep slope and incorporation into a pipeline bridge of the German railway company. (112)
linie
Impact assessment according to the EU Habitats Directive for the storage dam Großer Siebersteinsteich
linie Germany, Saxony- Anhalt
linie Impact assessment, measures for the protection of endangered species and landscape preservation measures within the scope of the rehabilitation of the storage dam Großer Siebersteinsteich. (99)
linie
Storm water treatment plants next to federal highway B31 West near Umkirch
linie Germany, Baden- Württemberg
linie 2 storm water treatment basins for the treatment of surface water from the new federal highway 31 West near Umkirch. (64)
linie
In-situ-remediation tank farm Breisach
linie Germany, Baden- Württemberg
linie Contamination with petroleum-derived hydrocarbons and BTEX on 1,5 ha of the saturated soil area, contamination with free phase oils; investigation, rehabilitation design, functional tendering, rehabilitation supervision, maintenance. (63)
linie
Geotechnical rehabilitation, landfill Ziegelwald, Gengenbach
linie Germany, Baden- Württemberg
linie Geotechnical and topographic survey, sliding mass mapping, infiltration tests, stability calculations, preliminary rehabilitation design, design, tendering procedure, supervision of construction of an abutment with slope toe drainage and recultivation via plant covering. (62)
linie
Redevelopment of the Cité area in Baden-Baden
linie Germany, Baden- Württemberg
linie Redevelopment of the technical infrastructure of a town area of some 50 ha formerly used by the French armed forces. Development of a traffic concept and complete redesign of the storm- and wastewater disposal systems. (41)
linie
New hydropower plant Rheinfelden
linie Germany, Baden- Württemberg
linie Run-of-river power plant composed of 4 power-generating units of 114 MW capacity. Design discharge: approx. 1,500 m³/s. The annual power production is around 600 GWh. Design and construction supervision of all infrastructural facilities. (37)
linie
Development of the former Vauban barracks ground and of a new solar-powered housing area in Freiburg
linie Germany, Baden- Württemberg
linie Site investigation for hazardous wastes, road design and traffic plan­ning, water supply and wastewater disposal, coordinated planning of utility lines. (3)
linie
back as at 2011-08-16