Fujairah wastewater treatment plant, United Arab Emirates

References | water supply and sanitation

Rehabilitation of a combined sewer in Leipzig (Jahnallee) / Germany
Rehabilitation of a combined sewer in Leipzig
Rehabilitation of a combined sewer in Leipzig
DESCPRIPTION OF PROJECT
In the course of the reconstruction of the boulevard "Jahnallee" in Leipzig, the following works were realised:
  • Rehabilitation of combined sewer on a length of 340 m using pipe lining technology
  • Rehabilitation of 6 inspection chambers by applying a mineral mortar coating
  • Rehabilitation of 95 house connections using the pipe lining system Houseliner®.
These rehabilitation works had to be realised underneath tramway tracks.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • 340 m pipe lining (egg-shaped sewer DN 850/1,300)
  • Partial relocation of ~30 house connections DN 150 to DN 300 for wastewater and stormwater without interruption of operation
  • Construction of 3 concrete and reinforced concrete manholes
  • Replacement of a glass fibre reinforced egg-shaped sewer (DN 850/1,300) on a length of ~ 30 m
  • Demolition works on the existing sewer
  • Maintenance repairs on the existing conduits

BRIEF DESCRIPTION
Rehabilitation of a combined sewer, 6 inspection chambers and 95 house connections
CLIENT
KWL Kommunale Wasserwerke Leipzig GmbH
FINANCING
KWL Kommunale Wasserwerke Leipzig GmbH
SCOPE OF SERVICES
  • Survey / Analysis
  • Preliminary design
  • Detailed engineering design
  • Official approval procedures
  • Final design
  • Tender docs / Tender action
  • Tender evaluation / Assist. in contract award
  • Co-ordination of construction supervision
  • Construction supervision
  • Structural engineering
158