Fish pass at the weir in Connewitz, Germany

References | environmental planning

Design and construction supervision of compensation measures following the construction of the A38 federal motorway / Germany
Biotope near A38 federal motorway
Biotope near A38 federal motorway
DESCPRIPTION OF PROJECT
The interference in nature and landscape resulting from the construction of the A 38 federal motorway (southern bypass Leipzig) was to be made up by compen­sation and substitution measures which were realised in the immediate and in the broader environs of the motorway. The following measures were implemented: Compensation for the cutting up of a biological habitat by the design of substitutional habitats (amphibian spawning grounds), design of vernal-autumnal ponds, appropriate hedges for the habitat, field coppice as well as orchards with regional fruit varieties, construction of clearance cairns, appli­cation of coarse woody debris, conception of succession areas and sowing of mixed meadow seeds.

Two years after the completion of the measures a success control was conducted and it was stated that the biotopes were accepted and populated by different groups of species.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • Redesigning of former agricultural acreages in Saxony and Saxony-Anhalt on an area of about 40 ha.
  • Planting of about 30.000 plants (coppice, shoots, deciduous trees, fruit trees), planning and design of: 2 permanently aquiferous spawning ponds for amphibians, 7 vernal-autumnal ponds, ditches, field coppice, hedges, fruit trees and extensive meadows.
  • Construction, operation and supervision of mobile guidance installations for amphibians as well as a "spawning prison" to encourage spawning in the newly designed spawning grounds, co-operation with the German nature conservation organisation "Naturschutzbund Deutschland, LV Sachsen".

BRIEF DESCRIPTION
Final design, tendering and supervision of implementation of ecological compensation measures
CLIENT
Motorway Board Saxony, Superintendence Leipzig
FINANCING
Motorway Board Saxony, Superintendence Leipzig
SCOPE OF SERVICES
  • Final design
  • Tender documents and tender action
  • Supervision of implementation: earthwork and planting activities, aquatic engineering
  • Project follow-up during warranty period
74