Traffic scheme Rheinfelden, Germany

References | highway and traffic engineering

Improvement and extension of the federal A5 motorway between the Achern and Appenweier interchanges / Germany
Design of federal motorway section (A5)
Design of federal motorway section (A5)
DESCPRIPTION OF PROJECT
Extension of the federal A5 motorway in order to include 6 traffic lanes on the present route. Preparation of a digital terrain model based on the inventory survey realized by the client. In the preliminary and detailed engineering design, the gradient was routed in a way that the underpass constructions could essentially be maintained. Optimisation of the area demand according to the environmental impact assessment.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • Construction length: approx.15 km
  • Adaptation of the Appenweier inter­change and existing parking lots to the widened motorway section











BRIEF DESCRIPTION
Improvement and widening of the motorway section between Achern and Appenweier to include 6 traffic lanes
CLIENT
Regional Administration Board, Freiburg
FINANCING
Regional Administration Board, Freiburg
SCOPE OF SERVICES
  • Preparation of a digital terrain model based on the results from the inventory survey
  • Environmental Impact Assessment, roadside development scheme
  • Preliminary and final design with detailed engineering
  • Calculation of noise levels according to the Federal Immission Control Act, Regulation n°16
  • Elaboration of a noise control scheme
61