Fujairah wastewater treatment plant, United Arab Emirates

References | water supply and sanitation

Water supply and sanitation of the town of Entebbe/ Uganda
Water treatment plant on Lake Victoria
Water treatment plant on Lake Victoria
DESCPRIPTION OF PROJECT
The project includes the rehabilitation and expansion of the existing water and sanitation facilities for the town of Entebbe. As complementary measures, the urban water supply system was extended over a length of 12 km along the Entebbe-Kampala road. Due to a substantial drop of the water level in Lake Victoria, the intake structure of Entebbe waterworks had to be redesigned and extended by around 300 m towards the interior of the lake. To improve the administration of the extended water supply area, the Project constructed an administration building, workshop and store.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • 152,000 total estimated population of Entebbe to be served (water supply)
  • New water treatment plant of 20,000 m³/d design capacity
  • Total length of water distribution system: 127 km,
    transmission main 17 km,
    2 pumping mains,
    2 reservoirs (4,000 a. 3,000 m³),
    2,000 house connections
  • Design capacity of pond sewage treatment plants: 500 m³/d
  • Total length of sewer network: 9 km with 1,000 house connections

BRIEF DESCRIPTION
Rehabilitation and extension of the water supply and sanitation facilities for the town of Entebbe.
CLIENT
National Water and Sewerage Corporation (NWSC)
FINANCING
KfW Entwicklungsbank
SCOPE OF SERVICES
  • System reconnaissance and detailed appraisal of systems capacities
  • Prepare final designs, Environ­mental Impact Assessment (EIA) and tender documents
  • Tender the required works based on procedures approved by NWSC and in compliance with KfW standards
  • Tender evaluation / assist in contract award and prepare all documents for the construction contract
  • Supervision of construction with design adjustments and additions / Assist in final handover of completed works
  • Training of waterworks staff and overall advisory monitoring of the project budget
  • Monitor administration, operation and maintenance procedures during the first 3 months of works operation including regular environmental auditing and monitoring
  • Assist the Client NWSCC during the one year guarantee and liability period