Fujairah wastewater treatment plant, United Arab Emirates

References | water supply and sanitation

Potable water conduit from Lindau waterworks to Wittenberg / Germany
Potable water conduit Lindau-Wittenberg
Potable water conduit Lindau-Wittenberg
DESCPRIPTION OF PROJECT
Within the scope of the project, the following services were provided:
  • Construction of a booster station for an existing waterworks facility
  • Design for the laying of a potable water conduit on a total length of 42 km including various transfer structures to the towns to be supplied
  • Crossing of the motorway A 9 and other roads, railway tracks as well as different water bodies
  • Resolving of all ownership issues as well as preparation of the license agreements
  • Design of a two-chamber reinforced concrete elevated tank made of in-situ reinforced concrete.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • Potable water conduit: DN 500, steel, 28.80 km; DN 500, ductile iron, 6.03 km; DN 400, ductile iron, 7.50 km
  • Booster station: Q = 6,000 m³/d
  • Elevated tank: V = 2 x 2,000 m³, Diameter of the circular water chambers: 23 m

BRIEF DESCRIPTION
Construction of a booster station, design of a potable water conduit with transfer structures and design of an elevated tank
CLIENT
TWM Trinkwasserversorgung Magdeburg GmbH (municipal water utility)
FINANCING
TWM Trinkwasserversorgung Magdeburg GmbH (municipal water utility)
SCOPE OF SERVICES
  • Preliminary design
  • Detailed engineering design
  • Official approval procedures
  • Final design
  • Tender docs / Tender action
  • Tender evaluation / Assist. in contract award
  • Co-ordination of construction supervision
  • Construction supervision
142