Fujairah wastewater treatment plant, United Arab Emirates

References | water supply and sanitation

Replacement of a potable water tank in Leipzig / Germany
Construction of potable water tank
Construction of potable water tank
DESCPRIPTION OF PROJECT
Construction of a two-chamber potable water tank made of reinforced concrete including operation building, external piping (up to DN 1,000), drainage system, transfer structures connecting the tank with the long-distance network as well as outlet structure for overflow and residual draining. Demolition of the old tanks and new design of the outside facilities.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • Water chambers with 33 m in diameter; height of the ring-walls: 6 m; capacity: 2 x 3,500 m³
  • In-situ reinforced concrete
  • Height of operation building: ~ 10 m
  • Demolition of 2 tanks à 7,300 m³

BRIEF DESCRIPTION
Construction of a two-chamber potable water tank
CLIENT
KWL - Kommunale Wasserwerke Leipzig GmbH (municipal water utility)
FINANCING
KWL - Kommunale Wasserwerke Leipzig GmbH (municipal water utility)
SCOPE OF SERVICES
  • Preliminary design
  • Detailed engineering design
  • Official approval procedures
  • Final design
  • Tender docs / Tender action
  • Tender evaluation / Assist. in contract award
  • Co-ordination of construction supervision
  • Topographic survey
  • Subsoil investigations
  • Construction supervision