Fujairah wastewater treatment plant, United Arab Emirates

References | water supply and sanitation

Wastewater treatment plant Kabale / Uganda
Pond type wastewater treatment plant Kabale
Pond type wastewater treatment plant Kabale
DESCPRIPTION OF PROJECT
The water supply and sanitation systems of the town of Kabale were in need of rehabilitation and expansion to comply with present and future requirements (50,000 p.e.).

Besides the typical engineering tasks like technical design, construction supervi­sion, final handing-over and commissio­ning of the water supply and sanitation facilities, the Consultant's services also included the development of specific proposals and recommendations for the management of the different then independent community water supply schemes with the aim of incorporating the individual networks (as far as economically viable) into the future central supply system. A further task included the recommendation of an appropriate administrative mechanism.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • New transmission main: 7.8 km
  • New distribution network: 55.5 km
  • Service pipes: 22.5 km
  • Water treatment plant: 180 m³/h
  • Main sewer: 6.3 km
  • Sewage treatment plant: 687 m³/d
  • Rehabilitation/extension of sewer lines: 18.8 km

BRIEF DESCRIPTION
Design and construction supervision of the rehabilitation and extension of the water supply and sanitation systems of a town of 50,000 inh.
CLIENT
National Water and Sewerage Corporation (NWSC)
FINANCING
KfW Entwicklungsbank
SCOPE OF SERVICES
  • Detailed engineering design
  • Economic study
  • Socio-economic study
  • Tender docs / Tender action
  • Assistance in contract award
  • Construction supervision
  • Final handing-over
  • Start-up operation
  • Training, upgrading and health education
52