As part of the major “Badische Rheinschiene Grid Reinforcement” (NBR) project, extensive modernization measures are being carried out at six substations (Daxlanden, Kuppenheim, Bühl, Weier, Kork and Eichstetten) between Karlsruhe and Freiburg. The existing double-circuit line between Daxlanden and Eichstetten is being upgraded from 220 kV to 380 kV as an approx. 120 km-long replacement new-build and is also being used as a pilot project for a high-temperature low-sag line. The upgrade works must be carried out during ongoing operation and in close cooperation with third parties (380 kV shared towers, 110 kV co-routed lines, line and track crossings, 20 kV dismantling works). Close coordination is also taking place with the relevant regional councils, which act as the permitting authorities.
Due to the level of grid utilization, lines can only be shut down to a very limited extent. For this reason, a detailed upgrade schedule employing several provisional structures has been developed, which is continually updated and serves as the basis for the time schedules of this major project. Fichtner is providing TransnetBW GmbH with comprehensive project control and planning services.
In this project, Fichtner Water & Transportation GmbH is providing services related to ecological monitoring of construction, with a particular focus on soil-scientific monitoring of construction to ensure soil protection before, during and after construction, as well as expert geotechnical support. We are also advising on environmental issues, such as water, emission, landscape, and groundwater protection, in connection with the construction works.