With the reconstruction of the interchange at the A 5/B 378 in Müllheim/Neuenburg and the adjacent junction “Am Wuhrloch”, we successfully transformed a complex traffic and planning challenge into a robust and viable solution.
The original layout caused congestion at the ramp entrances, with traffic backing up all the way to the motorway, and created critical traffic conditions on the state highway.
Based on a comprehensive traffic study, various options were evaluated, and a preferred solution involving three roundabouts was developed. We then studied the noise control aspects and incorporated them as a key element into the further planning.
Subsequently, we developed the design for the traffic facilities, which also included the preparation of the application documents for the approval process. We prepared the final design for the roundabouts, including necessary lanes and lane lengths, a stopping bay for heavy trucks, a bus stop, and safe passages and crossing options for pedestrians and cyclists. In addition, a viable construction phasing and traffic diversion concept was developed.
The result is an efficient, well-coordinated, and sustainable solution that significantly improves traffic flow, road safety, and usability.