Development Planning for the Zinnwald Lithium Mine

Saxony (Germany)

Project Factsheet

The development of the lithium deposit in Zinnwald in the German Eastern Ore Mountains aims to commercially utilize one of Europe’s largest lithium deposits for the battery industry. The plan is to extract 1.5 to 3 million tons of ore annually from underground mines and use it to produce 18,000 to 35,100 tons of lithium hydroxide. Due to limited space, the ore from the underground mine must be transported through a 10-kilometer-long tunnel to a suitable operating area. The processing plant, the surface facilities, and the utilities are then to be located in that planned operating area. Access for personnel and equipment to the mine will be provided via a second, shorter tunnel. For these reasons, multiple working points are necessary. Fichtner handled the entire development planning, including civil engineering structures, surface infrastructure, and technical feasibility assessment, thus providing a sound basis for the mining project.

t/a ore extraction
t/a lithium hydroxide production
Operating area
Key Facts

Planning of Infrastructure for the Zinnwald Lithium Mining Project

  • Options studies: comparison of above-ground conveyor belt system vs. tunnel
  • Planning of surface facilities and infrastructure (pre-feasibility)
  • Development planning of operating areas
  • Planning of site preparation and civil engineering structures
  • Planning of utility supply and disposal
  • Planning of transport connections 
  • Operating area of 50 ha
  • Ore extraction: 1.5–3.0 million t/a
  • Lithium hydroxide production: 18,000–35,100 t/a
  • Reserves: approx. 429,000 t of lithium