Waterworks "Sipplinger Berg"

Germany

Project Factsheet

In view of the advanced age of the waterworks "Sipplinger Berg", more stringent technological requirements (e.g. filter technology preventing the invasive Quagga mussel first detected in Lake Constance in 2016 from entering the system) and the expected increasing demand for drinking water (due to climate change amongst other reasons), the transport and treatment technology was to be upgraded to the latest technological standard. 

The Consultant was tasked with the planning of the reconstruction and extension measures for the integration of three new water intakes at the lake. The design services covered the upgrade of the existing inlet point for the raw water that is conducted via a pressure pipe from the Süßenmühle intake, including concrete rehabilitation and dismantling of micro screening equipment, as well as the design of a new inlet structure for the raw water supplied via pressure pipe from the Pfaffental intake. Furthermore, a connection and two branch structures were designed. 

Another focus was on the development of new process and plant technology including pipes, fittings, ozone dosing, electrical instrumentation & control technology, and overhead cranes. The project also included the underground installation of pipes up to DN 1,800, the extension of the existing ozone system, as well as the construction of a new intermediate storage basin serving as emergency overflow. Throughout the project, the requirements for critical infrastructure operators had to be observed and all necessary hydraulic and pipe statics calculations were carried out to ensure safe and secure water supply in the future. 

Max. flow rate in the raw water inlet structures
Max. flow rate in the raw water basins
Key Facts

Upgrade of the waterworks „Sipplinger Berg“ to meet more stringent requirements and increasing demand

  • Civil engineering structures 
  • Structural engineering 
  • Technical equipment 
  • Hydraulic calculations 
  • Baseline investigations 
  • Preliminary design 
  • Detailed engineering design 
  • Official approval procedures 
  • Coordinated planning of utility lines 
  • Max. flow rate in the raw water inlet structures: 29,400 m³/h 
  • Max. flow rate in the raw water basins: 15,100 m³/h 

Client

Zweckverband Bodensee-Wasserversorgung

Stuttgart
Germany