The weir complex "Stiftsmühle" in the inner city of Lippstadt was dilapidated and formed a hydraulic bottleneck in times of flooding. The weir was thus to be dismantled and replaced.
Reconstruction also included the integration of a fish pass to restore ecological connectivity in accordance with the European Water Framework Directive.
The project furthermore included the construction of a high-performance canoeing course for local canoeists and competitions.
The Consultant planned the required technical equipment for the control of the three structures and visualized the entire facility in 3D for public relation purposes.