Weir complex Stiftsmühle - reconstruction in the inner city of Lippstadt

Germany

Project Factsheet

The weir complex "Stiftsmühle" in the inner city of Lippstadt was dilapidated and formed a hydraulic bottleneck in times of flooding. The weir was thus to be dismantled and replaced.  
Reconstruction also included the integration of a fish pass to restore ecological connectivity in accordance with the European Water Framework Directive.  
The project furthermore included the construction of a high-performance canoeing course for local canoeists and competitions.  
The Consultant planned the required technical equipment for the control of the three structures and visualized the entire facility in 3D for public relation purposes. 

Head
Canoeing course of
Key Facts

Improved flood protection, restoration of ecological connectivity and canoeing course

  • Civil engineering structures 
  • Structural engineering 
  • Technical equipment 
  • Baseline investigations 
  • Topographic survey (during design/construction) 
  • Subsoil investigations 
  • Geotechnical calculations 
  • Hydrogeological studies 
  • Hydraulic investigations 
  • Preliminary, detailed engineering and final design 
  • Official approval procedures 
  • Public / Community relations 
  • Tendering 
  • Co-ordination of construction supervision 
  • Follow-up during warranty period 
  • Construction supervision 
  • Public / Community relations 
  • Head: 2.8 m  
  • Projected weir width: 12 m  
  • Canoeing course with a length of 110 m and a width of 10 m  
  • Discharge, which is not exceeded on only 30 days per year: 4.1 m³/s 
  • Discharge, which is not exceeded on 330 days per year: 28.5 m³/s 
  • Discharge for canoeing course: 3.6-14 m³/s 
  • Discharge for upstream fish pass: 0.5 m³/s 

Client

Bezirksregierung Arnsberg Lippstadt Dez. 54

Lippstadt
Germany