Selected project examples

Wastewater Collection and Treatment - Bihac, Bosnia and Herzegovina

Wastewater Collection and Treatment - Bihac, Bosnia and Herzegovina

The project’s target was to ensure the environmentally sound and hygienic collection and treatment of wastewater in the community of Bihac by upgrading the sewerage facilities and building a new wastewater treatment plant. The city of Bihac can thus achieve compliance with the provisions of the BiH Law of Environmental Protection and the EU Urban Waste Water Treatment Directive 91/271/EC.

Fichtner services

  • Topographic survey
  • Subsoil investigation
  • Sampling and analysis
  • Baseline investigations
  • Preliminary design
  • Detailed engineering design
  • Tender documents and assistance in contract award
  • Construction supervision
  • Follow-up during warranty period
  • Coordinated planning of utility lines
  • Safety and health coordination
  • Final handing-over

Technical data

  • Length of the sewerage network: 33 km
  • Population of Bihac: 62,000 inhabitants
  • Wastewater treatment plant capacity: 55,000 EW

Client

Community of Bihac, Bosnia and Herzegovina