Skip to main contentSkip to page footer

In view of the advanced age of the waterworks "Sipplinger Berg", more stringent technological requirements (e.g. filter technology preventing the…

With the reconstruction of the interchange at the A 5/B 378 in Müllheim/Neuenburg and the adjacent junction “Am Wuhrloch”, we successfully transformed…

The weir complex "Stiftsmühle" in the inner city of Lippstadt was dilapidated and formed a hydraulic bottleneck in times of flooding. The weir was…

wesernetz Bremen GmbH operates the power and water supply networks in Bremen. In the wake of coal phase-out, hard-coal-fired power plants in Bremen…

A traffic and noise study was completed in 2021 and now needs to be updated for the purpose of drafting a development plan for the Sana Hospital in…

The communities along the Ahr River were particularly affected by the flooding in 2021. The flood destroyed large parts of the towns and their…

The development of the lithium deposit in Zinnwald in the German Eastern Ore Mountains aims to commercially utilize one of Europe’s largest lithium…

As part of the major “Badische Rheinschiene Grid Reinforcement” (NBR) project, extensive modernization measures are being carried out at six…

The sections “Cranzer” and “Neuenfelder Hauptdeich” of the Elbe levee in Hamburg-Harburg are to be raised on a length of approximately 3.2 km to meet…